[1]Higgins A. Scheduling of railway maintenance activities and crews[J]. Journal of the Operational Research Society, 1998, 49:1026-1033.
[2]许玉德,曾学贵.建立整数型轨道状态最优综合维修计划模型[J].铁道学报,2003,25(6):85-88.[XU Y D, ZENG X G. Foundation of the optimized comprehensive integral track maintenance plan model[J]. Journal of the China Railway Society, 2003, 25(6): 85-88.]
[3]周宇,许玉德.基于遗传算法的轨道状态最优综合维修计划模型改进[J].华东交通大学学报,2005,22(1):15-20.[ZHOU Y, XU Y D. Designing of optimization track synthetical maintenance plan model based on genetic algorithms[J]. Journal of East China Jiaotong University, 2005, 22(1): 15-20.]
[4]Vale C, Ribeiro I, Calada R. Integerprogramming to optimize tamping in railway tracks as preventive maintenance[J].Journal of Transportation Engineering, 2012, 137(1): 123-131.
[5]Miwa M. Mathematicalprogramming model analysis for the optimal track maintenance schedule[R]. Japan: Railway Technical Research Institute, 2002, 43(3): 131-136.
[6]李雪,吴俊勇,杨媛,等.高速铁路接触网悬挂系统维修计划的优化研究[J].铁道学报,2010,32(2):24-29.[LI X, WU J Y, YANG Y, et al. Research on optimization of catenary system maintenance schedule for highspeed railways[J]. Journal of the China Railway Society, 2010, 32(2): 24-29.]
[7]陈绍宽,彭宏勤,毛保华,等.基于费用最小的铁路牵引变电所维修计划优化模型[J].铁道学报,2011,32(8):39-44.[CHEN S K, PENG H Q, MAO B H, et al. Optimization model of leastcostbased maintenance schedules for railway traction substations[J]. Journal of the China Railway Society, 2011, 32(8): 39-44.]
[8]陈绍宽,贾顺平,杜鹏,等.基于可靠性最大的铁路牵引变电所维修计划优化模型[J].交通运输系统工程与信息,2011,11(3):43-49.[CHEN S K, JIA S P, DU P, et al. Highest reliability-based optimum maintenance scheduling model for traction substations in railways[J]. Journal of Transportation Systems Engineering and Information Technology, 2011, 11(3): 43-49.]
[9]陈民武,李群湛,解绍锋.牵引供电系统维修计划的优化与仿真[J].华南理工大学学报(自然科学版),2009,37(11):100-106.[CHEN M W, LI Q Z, XIE S F. Optimization and simulation of maintenance plan of traction power supply systems[J]. Journal of South China University of Technology(Natural Science Edition), 2009, 37(11): 100-106.]
[10]余泽西.基于RCM的铁路基础设施维修管理信息系统的设计[J].交通运输系统工程与信息,2009,9(2):161-164.[YU Z X. RCM based design for comprehensive maintenance management information system of railway infrastructure[J]. Journal of Transportation Systems Engineering and Information Technology, 2009, 9(2): 161-164.]
[11]Zhao J, Chan AHC, Burrow MPN. Reliabilityanalysis and maintenance decision for railway sleepers using track condition information[J]. Journal of the Operational Research Society, 2007, 58: 1047-1055.
[12]Zhao J, Chan AHC, Burrow MPN. Agenetic-algorithmbased approach for scheduling the renewal of railway track components[J]. Proceedings of the Institution of Mechanical Engineers Part FJournal of Rail and Rapid Transit, 2009, 223: 533-541.
[13]Zhang T, Andrews J, Wang R.Optimal scheduling of track maintenance on a railway network[J]. Quality and Reliability Engineering International, 2012.
[14]Budai G, Huisman D,Dekker R.Schedulingpreventive railway maintenance activities[J]. Journal of the Operational Research Society, 2006, 57(9): 1035-1044.
[15]Coenraad Esveld. Model railway track(the second edition)[M]. MRTProductions: Zaltbommel, 2001:350-400.
[16]中华人民共和国铁道部.铁路线路修理规则[S].北京:中国铁道出版社,2010.[The Ministry of Railways of The People’s Republic of China. Repair rules for railway lines[S]. Beijing: China Railway Press, 2010.] |