[1] 褚飞跃,田志强,倪少权. 高速铁路单循环乘务排班计划编制模型与算法[J]. 铁道学报,2012, 34(7): 1-9. [CHU F Y, TIAN S Q, NI S Q. Model and algorithm for formulation of the single cycle crew rostering plans of high- speed railways[J]. Journal of the China Railway Society, 2012, 34(7):1-9.]
[2] 王莹,刘军,苗建瑞. 客运专线乘务交路计划编制的优化模型与算法[J]. 铁道学报,2009, 31(1): 15-19. [WANG Y, LIU J, MIAO J R. Modeling and solving the crew scheduling problem of passenger dedicated line [J]. Journal of the China Railway Society, 2009, 31(1): 15- 19.]
[3] Steinzen I, Gintner V, Suhl L, et al. A time- space network approach for the integrated vehicle- and crewscheduling problem with multiple depots[J]. Transportation Science, 2010, 44(3): 367-382.
[4] Mesquita M, Paias A. Set partitioning/covering- based approaches for the integrated vehicle and crew scheduling problem[J]. Computer & Operations Research, 2008, 35(5): 1562-1575.
[5] 张增勇,毛保华,杜鹏,等. 基于惩罚费用的城市轨道交通乘务排班优化模型与算法[J].交通运输系统工程与信息,2014, 14(2): 113-120.[ZHANG Z Y, MAO B H, DU P, et al. Urban rail transit crew scheduling model and algorithm based on punishment costs[J]. Journal of Transportation Systems Engineering and Information Technology, 2014, 14(2): 113-120.]
[6] 李献忠,徐瑞华. 基于时间耗费的城市轨道交通乘务排班优化[J]. 铁道学报,2007, 29(1): 21-25.[LI X Z, XU R H. Optimization of crew scheduling for urban rail transportation based on time costs[J]. Journal of the China Railway Society, 2007, 29(1): 21-25.]
[7] 李献忠,徐瑞华. 基于乘务广义费用的城市轨道交通排班[J]. 同济大学学报,2007, 35(6): 750-754.[LI X Z, XU R H. An optimal wide crew- related costs- based scheduling for crew of urban rail transportation[J]. Journal of Tongji University (Natural Sciense), 2007, 35(6): 750-754.]
[8] Zaepfel G, Boegl M. Multi-period vehicle routing and crew scheduling with outsourcing options[J]. International Journal of Product Economics, 2008, 113 (2): 980-996.
[9] Jutte S, Albers M, Thonemann U W, et al. Optimizing railway crew scheduling at DB schenker[J]. Interfaces, 2011, 41(2): 109-122.
[10] 胡思继. 列车运行图编制理论[M]. 北京:中国铁道出版社,2007. [HU S J. Theory of train diagram[M]. Beijing: China Railway Press, 2007.]
[11] 银大伟. 乘务计划编制系统的研究与设计[D], 西南交通大学,2008. [YIN D W. Research and design of crew scheduling system[D]. The Southwest Jiaotong University, 2008.]
[12] Yunes T H, Moura A V, de Souza C C. Hybrid column generation approaches for urban transit crew management problems[J]. Transportation Science, 2005, 39(2):274-288. |