[1] VON NEWMANN J, MORGENSTERN O. Theory of games and economic behavior[M]. Princeton University Press, 1944.
[2] ROBISON L J, SHUPP R S, MYERS R J. Expected utility paradoxes[J]. Journal of Socio-Economics, 2010, 39(2): 187-193.
[3] KAHNEMAN D, TVERSKY A. Prospect theory: An analysis of decisions under risk[J]. Econometrics, 1979, 47(2): 263-291.
[4] 刘诗序,陈文思,阎昊,等. 有限理性下考虑出发时间选择的网络交通流演化[J]. 交通运输系统工程与信息, 2017, 17(3): 127-135. [LIU S X, CHEN W S, YAN H, et al. Network traffic flow evolution considering departure time choice based on bounded rationality[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17(3): 127-135.]
[5] JOU R C, KITAMURA R, WENG M C, et al. Dynamic commuter departure time choice under uncertainty[J]. Transportation Research Part A, 2008, 42(5): 774-783.
[6] TVERSKY A, KAHNEMAN D. Advances in prospect theory: Cumulative representation of uncertainty[J]. Journal of Risk and Uncertainty, 1992, 5(4): 297-323.
[7] 曾建敏. 实验检验累积前景理论[J]. 暨南大学学报, 2007, 28(1): 44-47. [ZENG J M. An experimental test on cumulative prospect theory[J]. Journal of Jinan University, 2007, 28(1): 44-47.]
[8] WU G, GONZALEZ R. Curvature of the probability weighting function[J]. Management Science, 1996, 42 (12): 1676-1690. [9] PRELEC D. The probability weighting function[J]. Econometrica,1998, 66(3): 497-527.
[10] CAMERER C F, HO T H. Violations of the betweenness axiom and nonlinearity in probability[J]. Journal of Risk and Uncertainty, 1994, 8(2): 167-196.
[11] GUREVICH G, KLIGER D, LEVY O. Decision-making under uncertainty-A field study of cumulative prospect theory[J]. Journal of Banking & Finance, 2009, 33(7): 1221-1229.
[12] BLEICHRODT H, PINTO J L. A parameter-free elicitation of the probability weighting function in medical decision analysis[J]. Management Science, 2000, 46(11): 1485-1496.
[13] ABDELLAOUI M. Parameter-free elicitation of utilities and probability weighting functions[J]. Management Science, 2000, 46(11): 1497-1512.
[14] XU H L, ZHOU J, XU W. A decision-making rule for modeling travelers’ route choice behavior based on cumulative prospect theory[J]. Transportation Research Part C, 2011, 19(2): 218-228.
[15] SCHWANEN T, ETTEMA D. Coping with unreliable transportation when collecting children: examining parents’behavior with cumulative prospect theory[J]. Transportation Research Part A, 2009, 43(5): 511-525.
[16] STOTT H P. Cumulative prospect theory’s functional menagerie[J]. Journal of Risk and Uncertainty, 2006, 32 (2): 101-130.
[17] SCHWANEN T. Struggling with time: Investigating coupling constraints[J]. Transport Reviews, 2008, 28(3): 337-356. |