[1] KIEFER A, SCHILDE M, DOERNER K F. Scheduling of maintenance work of a large-scale tramway network[J]. European Journal of Operational Research, 2018, 270(3): 1158-1170.
[2] SU Z, JAMSHIDI A, NUNEZ A, et al. Multi-level condition-based maintenance planning for railway infrastructures: A scenario-based chance-constrained approach[J]. Transportation Research Part C: Emerging Technologies, 2017, 84: 92-123.
[3] 郭然, 韩宝明, 王福田. 整数型铁路线路养护维修计划优化模型[J]. 交通运输系统工程与信息, 2013, 13(4): 149- 156. [GUO R, HAN B M, WANG F T. Integral optimization model for scheduling railway maintenance [J]. Journal of Transportation Systems Engineering and Information Technology, 2013, 13(4): 149-156.]
[4] ARGYROPOULOU K, ILIOPOLOU C, KEPAPTSOGLOU K. Model for corrective maintenance scheduling of rail transit networks: Application to athens metro[J]. Journal of Infrastructure Systems, 2019, 25(1): 04018035.
[5] DAO C, BASTEN R, HARTMANN A. Maintenance scheduling for railway tracks under limited possession time[J]. Journal of Transportation Engineering, Part A: Systems, 2018, 144(8): 04018039.
[6] XIE S, LEI C, OUYANG Y. A Customized hybrid approach to infrastructure maintenance scheduling in railroad networks under variable productivities[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(10): 815-832.
[7] ZHANG T Y, LI D W, QIAO Y. Comprehensive optimization of urban rail transit timetable by minimizing total travel times under time-dependent passenger demand and congested conditions[J]. Applied Mathematical Modelling, 2018, 58: 421-446. |