[1] 麻士东,何运成,常芙蓉,等. PBN飞行程序验证中自动 飞行的仿真研究[J].交通运输系统工程与信息,2011, 11(6):51-52.[MA S D,HE Y C,CHANG F R,et al. Auto? matic flight simulation for validation of PBN flight proce? dure[J], Journal of Transportation Systems Engineering and Information Technology , 2011,11(6): 51-52.]
[2] 陈东程.RNP 在高原机场的运行优势[J].中国民用航空,2010 (120):26-28. [CHEN D C. The operational advantages of RNP at plateau airport [J].China Civil Aviation, 2010(120): 26-28.]
[3] FAA. Order8260.58“United states standard for performance based navigation (PBN) instrument procedure design”[S]. FAA,2012.09.
[4] ICAO. Required navigation performance authorization required (RNP AR) procedure design manual Doc 9905[S]. ICAO, 2011.04.
[5] 朱代武,王冬冬,杨姝,等. PBN飞行程序设计中障碍物评价辅助软件的开发研究[J].科学技术与工程,2012,12(35):9793-9796. [ZHU D W, WANG D D,YANG S,et al. Research of obstacle assessment auxiliary software[J]. Science Technology and Engineering, 2012, 12(35):9793-9796.]
[6] 王志学,李晔. 基于RNP AR进近程序的最后进近航段分析[J]. 中国民航大学学报, 2012, 30(5): 19- 22.[WANG Z X, LI Y. Analysis of final approach segment based on RNP AR approach [J]. Journal Civil Aviation University of China, 2012, 30(5): 19-22.] |