[1] 魏玉光, 苏寅, 张超, 等. 我国铁路集装箱旅客化快捷运输系统创新[J]. 中国铁路, 2016, 4(1): 1-7. [WEI Y G, SU Y, ZHANG C, et al. Innovation of passenger-like fast transport system of railway container[J]. Journal of China Railway, 2016, 4(1): 1-7.]
[2] BORNDÖRFER R, GRÖTSCHEL M, PFETSCH M. A column- generation approach to line planning in public transport[J]. Transportation Science, 2007, 41(1): 123- 132.
[3] 苏焕银, 史峰, 邓连波, 等. 面向时变需求的高速铁路列车开行方案优化方法[J]. 交通运输系统工程与信息, 2016, 16(5): 110-116. [SU H Y, SHI F, DENG L B, et al. Time- dependent demand oriented line planning optimization for the high- speed railway[J]. Journal of Transportation Systems Engineering and Information Technology, 2016, 16(5): 110-116.]
[4] GOERIGK M, SCHMIDT M. Line planning with useroptimal route choice[J]. European Journal of Operational Research, 2016, 259(2): 424-436.
[5] 付慧伶, 聂磊, 杨浩, 等. 基于备选集的高速铁路列车开行方案优化方法研究[J]. 铁道学报, 2010, 32(6): 1- 8. [FU H L, NIE L. YANG H, et al. Research on the method for optimization of candidate train set based train operation plan for high speed railways[J]. Journal of the China Railway Society, 2010, 32(6): 1-8.]
[6] 温旭红. 铁路车流分配优化模型与拉格朗日松弛算法求解研究[D]. 北京: 北京交通大学, 2016. [WEN X H. Study on railway car flow assignment optimization model and lagrangian relaxation algorithm[D]. Beijing: Beijing Jiaotong University, 2016.]
[7] LIN B L, WANG Z M, JI L J, et al. Optimization the freight train connection service network of a large-scale rail system[J]. Transportation Research Part B, 2012, 46 (5): 649-667.
[8] 郭洪文. 铁路集装箱旅客化运输组织模式及开行方案研 究 [D]. 北京: 北京交通大学, 2016. [GUO H W. Study on the passengerized transport organization mode and operation plan of railway container[D]. Beijing: Beijing Jiaotong University, 2016.] |