[1] CHAKROBORTY P, DEB K, SHARMA R K. Optimal fleet size distribution and scheduling of transit systems using genetic algorithms[J]. Transp Plann Technol, 2001, 24(3): 209-226.
[2] CASTELLI L, PESENTI R, UKOVICH W. Scheduling multimodal transportation systems[J]. Eur J Oper Res, 2004, 155(3): 603-615.
[3] 刘志刚, 申金升. 区域公交时刻表及车辆调度双层规划模型[J]. 系统工程理论与实践, 2007(11): 135-141. [LIU Z G, SHEN J S. Regional public transportation timetabling model with synchronization[J]. Systems Engineering-Theory & Practice, 2007(11): 135-141.]
[4] GUIHAIRE V, HAO J K. Transit network timetabling and vehicle assignment for regulating authorities[J]. Computers and Industrial Engineering, 2010, 59(1): 16- 23.
[5] IBARRA- ROJAS O J, GIESEN R, RIOS- SOLIS Y A. An integrated approach for timetabling and vehicle scheduling problems to analyze the trade- off between level of service and operating costs of transit networks [J]. Transp Res Part B, 2014 (70): 35-46.
[6] LAPORTE G, MESA J A, ORTEGA F A. Multiobjective integration of timetables, vehicle schedules and user routings in a transit network[J]. Transp Res Part B, 2017 (98): 94-112.
[7] JOÃO P F A, EVELIEN V D H A. A matheuristic for transfer synchronization through integrated timetabling and vehicle scheduling[J]. Transp Res Part B, 2018 (109): 128-149.
[8] 胡兴华. 基于运行图的快速公交运营系统研究[J]. 道路交通与安全, 2006, 6(11): 8-10. [HU X H. Research of bus rapid transit operation system based on BRT diagram[J]. Road Traffic and Safety, 2006, 6(11): 8-10.]
[9] 周洋帆, 王莹, 韦伟, 等. 考虑运行图约束的有轨电车干线信号协调优化模型[J]. 交通运输系统工程与信息, 2018, 18(2): 73- 79. [ZHOU Y F, WANG Y, WEI W, et al. An arterial signal coordination optimization model for trams considering timetable constraints[J]. Journal of Transportation Systems Engineering and Information, 2018, 18(2): 73-79.] |